← The Spokane Valley Wire
Infrastructure

I-90 eastbound lane closure Nov. 13-14

πŸ”Š Listen Β· narrated by Aiden

Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 begins at 8:30 pm on November 13, 2026. The closure will end at about 3:00 am on November 14, 2026, for concrete barrier replacement. Speed limit is reduced to 55 MPH during the closure.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/real-time/map
Source receipts3 of 3 passages supported Β· 100%

Automated checks compare the headline, summary and each body passage with the saved source. A checkmark records the model’s assessment; readers can inspect the quote. Source: original document β†—

  • βœ“
    I-90 eastbound lane closure Nov. 13-14β€œ090 [Spokane County, 18 mi from Spokane Valley]: Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 beginning at 8:30 pm on November 13, 2026 until about 3:00 am on November 14, 2026 for concrete barrier replacement. Speed limit reduced to 55 MPH.”
  • βœ“
    Single right lane closure on I-90 eastbound near SR 904 for concrete barrier replacement Nov. 13-14, 8:30 pm to 3:00 am.β€œ090 [Spokane County, 18 mi from Spokane Valley]: Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 beginning at 8:30 pm on November 13, 2026 until about 3:00 am on November 14, 2026 for concrete barrier replacement. Speed limit reduced to 55 MPH.”
  • βœ“
    Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 begins at 8:30 pm on November 13, 2026. The closure will end at about 3:00 am on November 14, 2026, for concrete barrier replacement. Speed limit is reduced to 55 MPH during the closure.β€œ090 [Spokane County, 18 mi from Spokane Valley]: Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 beginning at 8:30 pm on November 13, 2026 until about 3:00 am on November 14, 2026 for concrete barrier replacement. Speed limit reduced to 55 MPH.”
Source text saved for this check (2026-11-14T07:31:44.242Z)
090 [Spokane County, 18 mi from Spokane Valley]: Single right lane closure on I-90 eastbound at milepost 270.6 near SR 904 beginning at 8:30 pm on November 13, 2026 until about 3:00 am on November 14, 2026 for concrete barrier replacement. Speed limit reduced to 55 MPH.
Effective: Nov 13, 2026, 8:30 PM
Expected end: Nov 14, 2026, 3:00 AM
Source: https://wsdot.wa.gov/travel/real-time/map

The Spokane Valley Wire is free. Get Spokane Valley's news delivered every morning.