Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β
- β
State Route 202 will reduce to one lane nightlyβ202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 17, to Thursday morning, Aug. 20, sections of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
The reduction will be between Woodinville and Redmondβ202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 17, to Thursday morning, Aug. 20, sections of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
The reduction will occur from 9 p.m. to 5 a.m.βFrom 9 p.m. to 5 a.m. nightly Monday, Aug. 17, to Thursday morning, Aug. 20, sections of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
The reduction will last through Thursday morning, Aug. 20βFrom 9 p.m. to 5 a.m. nightly Monday, Aug. 17, to Thursday morning, Aug. 20, sections of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
Flaggers will shift traffic as crews workβFlaggers will alternate traffic through the work zone, which will shift nightly as crews make progress with pavement repairs.β
- β
The action is per WSDOT recordsNo usable supporting receipt β unverified.
- β
I-405 will have southbound lane closures nightlyβ405: Up to two lanes of southbound I-405 from milepost 7 to milepost 6 will be closed nightly 10:30 p.m. Wednesday, Aug. 19 β 5 a.m. Friday, Aug. 21.β
- β
The southbound lane closures will last through Friday, Aug. 21No usable supporting receipt β unverified.
- β
There will be a full closure of all southbound lanes from Coal Creek Parkway to North 30th Streetβ405: All lanes of southbound I-405 from Coal Creek Parkway Southeast to North 30th Street will be fully closed day and night, 11:30 p.m. Friday, Aug. 21 β 4 a.m. Monday, Aug. 24. Signed detours will be in place.β
- β
The full closure will occur from 11:30 p.m. Friday to 4 a.m. Mondayβ405: All lanes of southbound I-405 from Coal Creek Parkway Southeast to North 30th Street will be fully closed day and night, 11:30 p.m. Friday, Aug. 21 β 4 a.m. Monday, Aug. 24. Signed detours will be in place.β
- β
Northbound I-405 will also close nightlyNo usable supporting receipt β unverified.
- β
The northbound closure will last through Thursdayβ405: Up to two lanes of northbound I-405 from Coal Creek Parkway Southeast (milepost 10) to I-90 (milepost 11) will be closed nightly 9 p.m. Monday Aug. 17 β 4:45 a.m. Thursday, Aug. 20.β
- β
I-5 will close northbound lanes overnight between SR 503 and Dike Access Roadβ005: From 8 p.m., Wednesday, Aug. 19, to 5 a.m. Thursday, Aug. 20: Up to two lanes of northbound I-5 will close overnight between the SR 503 interchange (milepost 21.5) and Dike Access Road (milepost 23), for paving work.β
- β
The closure will occur on Wednesday night through Thursday morning, Aug. 19-20β202: From 9 p.m. to 5 a.m. nightly Monday, Aug. 17, to Thursday morning, Aug. 20, sections of SR 202 will reduce to one lane between Woodinville and Redmond for crack sealing and pavement repair.β
- β
Ramp closures will be in placeβNote: The on-ramp from SR 503 at Exit 21 to northbound I-5 will close, and the off-ramp from northbound I-5 to Exit 22 for Dike Access Road will also close.β
- β
SR 9 will see flagger-controlled traffic on Wednesday and Thursdayβ009: Daily from 9 a.m. to 2 p.m. beginning Wednesday, Aug. 19 to 2 p.m. Thursday, Aug. 20, State Route 9 traffic between Otter Pond Drive and West Big Lake Boulevard (milepost 47) will alternate with flaggers for Ziply utilities work.β
- β
The traffic control is for utility workNo usable supporting receipt β unverified.
- β
All closures are scheduled to end by Monday, Aug. 24No usable supporting receipt β unverified.
- β
The end date is per WSDOTNo usable supporting receipt β unverified.