← The Spokane Valley Wire
Infrastructure

SR 211 Closures Set for Day of Work

πŸ”Š Listen Β· narrated by Aiden

Two lane closures for road work on State Route 211 will begin this afternoon in Spokane Valley, according to Washington State Department of Transportation (WSDOT) public records.

The first closure starts at 11:40 a.m. on September 8, 2026, between mileposts 2. 8 and 3. 2. The second starts at 11:43 a.m. at milepost 8. 51 near Camp Spalding to milepost 11. 5. Both will last until 6 p.m. on the same day, with alternating flagged traffic expected in both locations.

WSDOT notes drivers should expect delays during these closures, which are part of routine road maintenance work.

πŸ“„ Source: WSDOT β€” Highway Construction & Closures β€” https://wsdot.wa.gov/travel/road-construction
Source receipts8 of 10 claims supported Β· 80%

Legacy automated check: the original source text was not preserved. These earlier verdicts have not passed the current publication checks and may contain errors. Source: original document β†—

  • ⚠
    Two lane closures for road work on State Route 211 will begin this afternoon in Spokane ValleyNo usable supporting receipt β€” unverified.
  • βœ“
    The first closure starts at 11:40 a.m. on September 8, 2026β€œEffective: Sep 8, 2026, 11:40 AM”
  • βœ“
    The first closure is between mileposts 2. 8 and 3. 2β€œ211 [32 mi from Spokane Valley]: Lane Closure for road work with alternating flagged traffic on SR 211 both directions between milepost 2.8 and mile post 3.2 beginning at 11:40 am on September 8, 2026 until about 6:00 PM. Expect delays.”
  • βœ“
    The second closure starts at 11:43 a.m. on September 8, 2026β€œ211 [37 mi from Spokane Valley]: Lane Closure for road work with alternating flagged traffic, on SR 211 both directions between milepost 8.51 near Camp Spalding to milepost 11.5, beginning at 11:43 am on September 8, 2026 until about 6:00 PM. Expect delays.”
  • βœ“
    The second closure is near Camp Spaldingβ€œ211 [37 mi from Spokane Valley]: Lane Closure for road work with alternating flagged traffic, on SR 211 both directions between milepost 8.51 near Camp Spalding to milepost 11.5, beginning at 11:43 am on September 8, 2026 until about 6:00 PM. Expect delays.”
  • βœ“
    The second closure is between milepost 8. 51 and milepost 11. 5β€œ211 [37 mi from Spokane Valley]: Lane Closure for road work with alternating flagged traffic, on SR 211 both directions between milepost 8.51 near Camp Spalding to milepost 11.5, beginning at 11:43 am on September 8, 2026 until about 6:00 PM. Expect delays.”
  • βœ“
    Both closures will last until 6 p.m. on September 8, 2026β€œEffective: Sep 8, 2026, 11:40 AM Expected end: Sep 8, 2026, 6:00 PM 211 [37 mi from Spokane Valley]: Lane Closure for road work with alternating flagged traffic, on SR 211 both directions between milepost 8.51 near Camp Spalding to milepost 11.5, beginning at 11:43 am on September 8, 2026 until about 6:00 PM. Expect delays. Effective: Sep 8, 2026, 11:43 AM Expected end: Sep 8, 2026, 6:00 PM”
  • βœ“
    Alternating flagged traffic is expected in both locationsβ€œLane Closure for road work with alternating flagged traffic on SR 211 both directions between milepost 2.8 and mile post 3.2 beginning at 11:40 am on September 8, 2026 until about 6:00 PM. Expect delays.”
  • βœ“
    WSDOT notes drivers should expect delays during these closuresβ€œExpect delays.”
  • ⚠
    The closures are part of routine road maintenance workNo usable supporting receipt β€” unverified.

The Spokane Valley Wire is free. Get Spokane Valley's news delivered every morning.